Build a construction water-supply schedule

A building site in Riyadh does not run on “send a tanker when someone remembers”. It runs on a weekday plan: water type (usually service water), size the gate can take, how many drops a week, and who opens the stand. That is the company contracts path — not a one-off villa message every afternoon.

What the schedule must name

Item Why it is on the sheet
Water type Service water for mix and dust; drinking only if a separate tank exists
Size Six / 12 / 18 / 32 after access — not after a slogan
Weekly trip count A range is fine; “on demand” is not a plan
Window Day shift, night gate, or Friday shutdown
Stand and hose Where the truck stops without blocking the crane
Site contact A name that answers when the truck is at the gate

How to estimate the first week

Start from tank litres and how fast the crew empties them — see tank maths. Then watch two or three working days. If an 18-ton drop lasts one shift, do not write “one drop a week”. If a six lasts two days in an alley site, keep the six and add a weekday, rather than jumping to 32 tons that cannot enter.

Access before you print 32 tons on the sheet

A construction schedule that names 32 tons without a truck gate will fail on day one. Read whether 32 tons can access the site. Many finishing sites stay on 18 tons. Tight streets stay on a six.

Type stays locked

Do not switch a service-water stand to drinking because someone asked for a cooler fill on the same truck. Separate tanks, separate lines. Drinking vs service water.

What we do not put on a public page

We do not publish a fixed “construction tanker price” or a fake weekly volume for Riyadh. The offer follows district, size, wait at the gate and trip count — price factors. Documented supply operations (including large public sites) are scheduled after a site check, not claimed as if we built those projects. See Our work.

How to send the first schedule

  1. Site pin or district (Arabic neighborhood names are fine).
  2. Gate photo or a one-line access note.
  3. Planning litres or tank count.
  4. Proposed weekdays and a night/day window.
  5. A site contact who will be there.

Use the request form and mark it as a company / site job, or start from contracts.

Send weekly trip count, size after access, water type and a site contact. We lock the book after that — not from a slogan.

Company contracts · Request form · 0568739666 · WhatsApp

Common questions

Can the schedule change mid-week?

Yes if the crew or the pour changes. Tell us before the truck has already moved. A no-show at a locked gate is waiting on the job.

Do I need a contract for two drops?

Two drops can stay on the form. A repeating site should move to a schedule so the same size and type stay locked.

Is this the same as a home tanker?

No. A home is usually one tank and one window. A site is a week and a gate.

Last reminder

Write type, size after access, weekly count, window and a name at the gate. Then request. We confirm after site facts. 0568739666.